|
I'm assuming you've got AS 3.8?
1. Open the Activesync window.
2. Go to Tools->Options
3. Select Calender, then press the Settings.. button
Alternatively, in the main window, right click on Calender and select the Settings option. The sync options are there (including the number of weeks to sync).
__________________
"A planner is a gentle man, with neither sword nor pistol.
He walks along most daintily, because his balls are crystal."
|